1.
Operating Temperature: RT-950deg. C.
2.
Max. Temperature: 1000deg. C.
3.
Actual Dimension of Furnace Tube: φ 90mm× 2100mm.
4.
Load Bearing of Furnace Tube When Heating: ≥ 25Kg.
5.
The Length of Heating Zone: 1200mm.
6
. Controlled Zone: 3 Zones, K Type thermocouple.
7.
Temperature Control Precision: ± 1deg. C.
8
. Temperature Control Mode: Use Shimaden temperature controller, heating rate is adjustable.
9.
Heating Mode: Use infrared FEC heater, furnace.
10.
Atmosphere: Feed the nitrogen to the chamber first, after emptying the air in the chamber, feed the mixed gases ( nitrogen and hydrogen).
11.
Cooling Mode of Furnace exit: Water cooling.
12.
Gas Flow: ≤ 30 L/min.
13.
Heating up Time of Empty Furnace: ≤ 80min (From RT to 950 deg. C).
14
. Max. Heating Power: 12kW.
15.
Insuation Power of Empty Furnace: 4Kw,
16.
The Temperature of the Furnace Surface: ≤ RT+40 deg. C.
17.
Input Power Supply: 3 phase 50Hz, 380V± 10%.
18.
Overall Dimension: 2300× 700× 1450(L× W× H)(for reference)
We (Hengli Eletek) have been designing and manufacturing industrial furnaces for over 30 years as part of a major electronics research institute. We were incorporated as a company in 1992 and today occupy a state-of-the-art ISO9001-certified design and manufacturing facility. Today, our furnaces are used by customers in Australia, Austria, Canada, China, Costa Rica, Hong Kong, Hungary, India, Indonesia, Israel, Italy, Malaysia, Mexico, Netherlands, Russia, Singapore, Slovenia, South Korea, Spain, Sri Lanka, Switzerland, Taiwan, Turkey, UK, USA and Vietnam. We have served the furnace needs of many renowned customers including Apple, IBM, Ferro, Eaton, Schott AG, EBG, First Solar, NASA, Neways Micro, Coilcraft, PCB, 3G Solar, Materion, and more.
Furnace can be produced (procedure 90~135days) right away after pre-payment confirmation. COSCO Maersk MSC ship to worldwide for safe shipping, don't worry about package damage or loss. It takes about 15-40 days to worldwide, Please note us your contact details include your phone number for easy contacting from shipping company officer.
By Sea |
Delivery from Shanghai seaport |
By Air |
Departure from Shanghai Pudong Airport |
By Express |
Post by DHL, EMS, UPS, TNT, FedEx. |
Payment Terms |
T/T |
EXW |
50% T/T in advance, the rest balance paid before shipment |
FOB |
CFR |
CIF |
L/C |
L/C amount above 200,000 USD, we can accept L/C at sight |