Platform for Oip Open Integration

Product Details
Customization: Available
Certification: ISO9001, CSA
Protection: Anti-static
Manufacturer/Factory
Gold Member Since 2012

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, ISO 9000
  • Platform for Oip Open Integration
  • Platform for Oip Open Integration
  • Platform for Oip Open Integration
  • Platform for Oip Open Integration
  • Platform for Oip Open Integration
  • Platform for Oip Open Integration
Find Similar Products

Basic Info.

Model NO.
hengli7
Installation
Vertical
Housing
Stainless Steel
Application
Integration Platform
Transport Package
Standard Exported Package
Specification
undetermined
Trademark
Hengli
Origin
China
HS Code
8514300090
Production Capacity
200 PCS/Year

Product Description

Independent research and development of the company, based on the network of open distributed integrated software platform.Covering portal management, message service center, data service center, master data management, script engine and intelligent operation and maintenance of six functional sections.It provides ERP/PLM MES and other information system interfaces, and supports the data docking of the cloud platform of the Internet of things
Platform for Oip Open Integration

We (Hengli Eletek)  have been designing and manufacturing industrial furnaces for over 30 years as part of a major electronics research institute. We were incorporated as a company in 1992 and today occupy a state-of-the-art ISO9001-certified design and manufacturing facility. Today, our furnaces are used by customers in Australia, Austria, Canada, China, Costa Rica, Hong Kong, Hungary, India, Indonesia, Israel, Italy, Malaysia, Mexico, Netherlands, Russia, Singapore, Slovenia, South Korea, Spain, Sri Lanka, Switzerland, Taiwan, Turkey, UK, USA and Vietnam. We have served the furnace needs of many renowned customers including Apple, IBM, Ferro, Eaton, Schott AG, EBG, First Solar, NASA, Neways Micro, Coilcraft, PCB, 3G Solar, Materion, and more.
Platform for Oip Open Integration
Furnace can be produced (procedure 90~135days) right away after pre-payment confirmation. COSCO Maersk MSC ship to worldwide for safe shipping, don't worry about package damage or loss. It takes about 15-40 days to worldwide, Please note us your contact details include your phone number for easy contacting from shipping company officer.
 By Sea Delivery from Shanghai seaport
By Air Departure from Shanghai Pudong Airport
By Express Post by DHL, EMS, UPS, TNT, FedEx.
Platform for Oip Open Integration
Platform for Oip Open Integration

Payment Terms
 
 
T/T
EXW  
 
50% T/T in advance, the rest balance paid before shipment
FOB
CFR
CIF
L/C          L/C amount above 200,000 USD, we can accept L/C at sight

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier