Customization: | Available |
---|---|
Certification: | CE, ISO |
Place Style: | Horizontal |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Typical application fields | It is mainly used for the annealing heat treatment process of solar cell glass substrate under the condition of air atmosphere |
Code | Name | Length | Explain | |
A | Total length | 28200mm | ||
B | Import/ export platform | 1500mm | 1350±20mm above the ground,The length of import and export platforms are the same |
|
C | Furnace frame | 25200mm | ||
D | Import transition section |
900mm | Including air curtain | |
E | Import insulation transition | 900mm | Ceramic fiber material thermal insulation transition, including exhaust pipe | |
F | Heating section | 16200mm | There are 18 temperature zones in total.The power is 14kw per zone and the length is 900mm per zone; The total design power is 252kw | |
G | Free cooling zone | 900mm | No heating element, thermal insulation material | |
H | Water cooling zone | 4500mm | Four sections water cold steel jacket (water cooling coil type), and the last section of steel jacket contains 350mm air curtain. | |
I | Forced air cooling section | 1800mm | Forced air cooling with large air volume | |
K | Equipment height | 2000mm | Excluding chimney, feet and indication light heigh | |
L | Equipment operation panel layout location | |||
Furnace structure | Large furnace cavity and ultra light insulation material masonry structure are adopted | |||
Effective height | 50mm | |||
Equipment weight | About 27000kg | |||
Overall dimension | 28200×2600×2000mm(L×W×H),excluding foundation, chimney and indicator light | |||
Appearance color | The hanging plate adopts high-temperature plastic spraying, the color is camel gray computer color | |||
Glass specification | 1245×635×3mm;glass size deviation<±2mm,glass warpage degree≤3mm | |||
Production cycle | ≤60sec | |||
Feeding mode | Long side feed(1245mm) | |||
Glass fragmentation rate | <3‰ | |||
Equipment stability | MTBF(Interval between equipment failures):≥720 hours/time | |||
MTTR(Maintenance time of equipment failure):≤2hours/time | ||||
Uptime:≥98% | ||||
Schedule PM time:<1% | ||||
Unscheduled maintenance time:<1% | ||||
Special requirements | The stainless steel tank ceiling device on the upper part of the furnace can effectively prevent the top insulation material from falling and improve the cleanliness of the furnace |
By Sea | Delivery from Shanghai seaport |
By Air | Departure from Shanghai Pudong Airport |
By Express | Post by DHL, EMS, UPS, TNT, FedEx. |
Payment Terms |
T/T |
EXW | 50% T/T in advance, the rest balance paid before shipment |
FOB | |||
CFR | |||
CIF | |||
L/C | L/C amount above 200,000 USD, we can accept L/C at sight |