Customization: | Available |
---|---|
After-sales Service: | 12 Months |
Warranty: | 12 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
No. | Name | Length | Note |
A | Total Length | 6905mm | |
B | Load and Unload Table | 600mm | Distance from ground height 770 ~ 820 mm, the length of load and unload table is the same. |
C | Furnace frame | 5705mm | |
D | Entrance Vestibule Zone | 350mm | Include entrance curtain (multilayer stainless steel sheet). |
E | Entrance Insulation Zone | 150mm | Ceramic fiber insulation |
F | The Heating Zone | 3150mm | 7 zones, the length of each zone:450mm |
G | Cooling Zone | 450mm | No heating elements, Insulation material |
H | Exit Insulation Zone | 150mm | Ceramic fibre material thermal transition |
I | Forced Air Cooling Zone | 1455mm | No insulation material, mechanical fan blows the furnace tube directly. |
J | Furnace Height | 1250mm | Exclude the exhaust stack height |
K | Equipment operation panel position |
Code | Name | Explanation |
A | Entrance Curtains | Prevent outside air from entering the chamber |
B | Burn off Gas Inlet | Used for normal air supplement of heating zone |
C | Venturi Exhaust Gas Inlet | The manual valve on Venturi exhaust tube can be used for adjusting gas flow. |
D | Firing Zone Gas Inlet | Use for controlling gas flow direction to prevent the glue pollute the product. |
E | Exit curtains | To prevent outside air from entering the furnace to ensure that the product of the firing process requirements |
The actual gas flow of each pipe can be displayed by flowmeters |
By Sea | Delivery from Shanghai seaport |
By Air | Departure from Shanghai Pudong Airport |
By Express | Post by DHL, EMS, UPS, TNT, FedEx. |
Payment Terms |
T/T |
EXW | 50% T/T in advance, the rest balance paid before shipment |
FOB | |||
CFR | |||
CIF | |||
L/C | L/C amount above 200,000 USD, we can accept L/C at sight |